
GT STAMBRIDGE A large annexe which required 250 tons of waste removal and site clearance before construction could begin.

Gt Stambridge Before shot from the rear of the property

Gt Stambridge Foundation layout and site preparation

GT STAMBRIDGE During construction without internal walls

GT STAMBRIDGE as the project progresses rear shot of bedroom window and lounge bi folding doors

GT STAMBRIDGE patio sub base and area being prepared

GT STAMBRIDGE finished shot from the rear inc new porcelain patio and turfed lawn area

GT STAMBRIDGE completed with shot of the open kitchen lounge dining area